SKU#: HDXFUIBRD001

Hayward Display Board And Ribbon Cable

 

Communication error   Code CE

 If communication between the ignition control board and the display board is not established within 3 s of power-up or is lost for 30s during operation unit will shut down and error will be displayed. The error code will be cleared upon a valid data exchange between boards.

$199.99

REPLACEMENT PROCEDURE

  1. Turn the pump, main gas valve, and heater power off.
  2. Remove the single screw securing the top access panel to the cabinet top.
  3. Unplug the installed ribbon cable from the ignition control board inside the heater cabinet. Remove the connector from the ignition board by depressing the locking mechanism in the center of the connector before pulling it free.
  4. On the underside of the top access panel, remove four (4) screws securing the display board cover and remove cover.
  5. Disconnect the membrane switch ribbon cable from the side of the display board and remove the board from the top access panel.
  6. Reverse the above procedure to install the new display board.

Ask a Question
Hayward Display Board | HDXFUIBRD001 Hayward Display Board | HDXFUIBRD001
Hayward Display Board | HDXFUIBRD001
  • Product Details

    About this product

    Description

    1. This instruction sheet is intended for use only with the service kit HDXFDSPB0001.
    2. This kit is intended to be used only with Haywards Universal H-Series Compact gas heater models. These heaters may be identified by inspection of the jeater rating plate ( there should be an " HDF" at the beginning of the model number ) or by visual inspection of the heater in comparison to the diagrams in these instructions.

    Features

    REPLACEMENT PROCEDURE

    1. Turn the pump, main gas valve, and heater power off.
    2. Remove the single screw securing the top access panel to the cabinet top.
    3. Unplug the installed ribbon cable from the ignition control board inside the heater cabinet. Remove the connector from the ignition board by depressing the locking mechanism in the center of the connector before pulling it free.
    4. On the underside of the top access panel, remove four (4) screws securing the display board cover and remove cover.
    5. Disconnect the membrane switch ribbon cable from the side of the display board and remove the board from the top access panel.
    6. Reverse the above procedure to install the new display board.

    Brand Information

    Hayward Industries, Inc. is the largest manufacturer of residential swimming pool equipment in the world. Headquartered in Elizabeth, New Jersey, Hayward designs and markets the Totally Hayward® System, a complete line of state-of-the-art, energy efficient residential pool equipment including pumps, filters, heaters, heat pumps, cleaners, electronic control systems, electronic chlorinators, lighting, safety equipment.

    Visit Manufacturers Website
  • Specifications

    If the heater display is blank after the electrical has been installed, refer to Troubleshooting Lookup Chart to determine the cause. Note, the ribbon cable between the display board and the ignition control board is keyed to ensure correct connection.